Gas Suppression testing and air leakage identification using infrared thermography
The Protos Energy Recovery Facility (ERF), located in Cheshire, is a large energy-from-waste power station that processes non-recyclable waste to generate electricity. In addition to energy production, the facility recovers useful materials from residual waste streams and is designed to incorporate carbon capture technology to reduce emissions.
The plant has a total annual processing capacity of approximately 400,000 tonnes of non-recyclable waste. It operates using two energy recovery lines, each with a capacity of around 200,000 tonnes per year.
AiroTech carried out gas suppression system testing across multiple critical areas of the facility. These included:
- Medium Voltage (MV) room
- Low Voltage (LV) rooms
- 33kV electrical rooms (LV & HV)
- Electrical Ancillary Building (EAB) room
- Distributed Control System (DCS) rooms
- Battery room
- Crane room
- Two backup generator rooms
These systems are essential for fire protection in high-risk electrical and control environments, helping ensure operational safety and continuity within the plant.