Beinn An Tuirc Windfarm Phase 3 (BAT 3)

Project Description

AiroTech carry out an air tightness on an onshore wind farm control facility on the Kintyre peninsula for one the UK’s largest onshore wind farm producers. This was phase 3 of the development consisting of 14 wind turbines producing 50 megawatts of power increasing the number of wind turbines on the site to 78.

SSE Logo

Project Details

  • Kintyre Peninsula

  • SSE

  • Air Tightness Testing

  • September 2021

Air Tightness Testing at Beinn An Tuirc Windfarm
Contact Us

Need an Air Tightness Test or Infrared Thermography?

If you require Air Tightness Testing or Infrared Thermography for your Commercial or Residential property, please contact AiroTech for a quotation or to discuss your requirements.

Contact Us